Roll over image to zoom in

Construction of ski Lift

All photos property of the Tread of Pioneers Museum.
No duplication, reprinting, or use permitted without written consent of the Tread of Pioneers Museum.
2502
Construction of ski Lift
1962
Crews install towers, possibly for the Poma Lift at the base of See Me. The photo was previously identified as the Christie Lift towers, however, those towers were square not round. Information provided by Jim Barrows. 7.2015
Steamboat Springs
Mt. Werner/Storm Mountain
Skiing/Jumping
Automobile/Machinery
B & W Photo
Scanner: Epson 1640 SU